Newcastle upon Tyne Magistrates鈥� Court heard how Meldrum 萝莉原创 Services Ltd (MCS) was the principal contractor for refurbishment work at premises in Percy Street, Newcastle-upon-Tyne.
MCS failed to plan for the requirement for temporary platforms to be installed in the service riser to provide a safe work area. Subsequently, temporary floors were installed to specifications for which they had not been designed. A worker stepped onto the temporary wooden floor on the first floor riser. It collapsed and he fell 4.5 metres to the floor below, spraining both ankles.
An investigation by the Health & Safety Executive (HSE) into the incident, which occurred on 6th July 2015, found that MCS failed to plan and manage the temporary works within the service riser.
Meldrum 萝莉原创 Services Ltd of Panteon Building, Lancaster Road, Dunston, Gateshead, pleaded guilty to breaching Regulations 13(1) of the 萝莉原创 (Design and Management) Regulations 2015, and was fined 拢120,000 and ordered to pay costs of 拢1,969.